323 Commissioning is an independent third-party commissioning agent working out of North Texas. We do not design mechanical systems and we do not install them — which is the entire reason our findings are worth anything to the person paying for the building.

Scope
Commissioning only, owner and contractor side
Region
North Texas, select national
Interest in the outcome
None

Whose stamp is on it?

Plenty of firms will commission your building. Some of them designed it. Some of them installed it. The work looks identical on a proposal, and it is not identical at all at the three moments below — which are the only three moments commissioning is really for.

When a deficiency turns up

A party with exposure

Correcting it costs their own crew, their own material, or their own fee. The cheapest finding is the one nobody writes down.

323

Writing it down costs us nothing. It gets an ID, a severity and an owner, and it stays open until somebody verifies it closed.

When the schedule compresses

A party with exposure

Testing is the easiest scope to shorten, and the party holding the schedule is the party deciding what to shorten.

323

Testing is our entire scope. We report what was tested, what was not, and what that leaves unverified. The owner decides.

When the warranty year closes

A party with exposure

The party being asked to come back and fix it is the same party who installed it in the first place.

323

We run the warranty-period review, so the callback list is not written by the people it is addressed to.

Field verification

Contact sheet · 5 frames
Overhead ductwork, flexible runs and unistrut trapeze above metal stud framing, before the ceiling is closed.
Overhead distribution before the ceiling closes — the last point at which most of it is reachable without a lift and a ceiling tile.
  • Two rooftop cooling tower fans, with a city skyline and open ocean beyond.

    Cooling tower fans, rooftop.

  • A labelled fire damper with its access door open in a rated assembly.

    Fire damper and access door — tagged, and reachable for testing.

  • A signed structural beam with a tree and a flag, hoisted by crane at a topping-out.

    Topping out. The last beam, signed by the people who built it.

  • An opened kitchen fire suppression cabinet above a ceiling, showing two cylinders and the actuator.

    Kitchen suppression cylinders and actuator, behind the cabinet door.

What we are brought in to do

Full scope of services
For owners4 scopes
SVC-01
New construction

New construction commissioning

From design review through the warranty year, on the owner's side of the table the whole way.

  • Design and submittal review
  • Installation verification
  • Functional performance testing
  • Turnover, O&M and training verification
  • Warranty-period review
SVC-02
Existing buildings

Retro-commissioning and existing buildings

The building is already running. The question is whether it is running the way somebody once specified.

  • System inventory and investigation
  • Diagnostic trending and functional testing
  • Deficiency log and improvement findings
  • Implementation support
  • Persistence and re-test
SVC-03
LEED / energy code

LEED and energy code commissioning

The documentation a certification body or a code official will actually accept, produced by a third party.

  • Fundamental commissioning and verification
  • Enhanced commissioning scope
  • Systems manual and training verification
  • IECC and ASHRAE 90.1 compliance support
SVC-04
Design reviews

Design phase reviews

The cheapest point in a project's life to fix anything is before it has been drawn twice.

  • Milestone reviews at SD, DD and CD
  • Comment log with priority and owner
  • Specification review for testability
  • Back-check before the set goes out to bid
SVC-05
Contractor support

Contractor commissioning support

Systems prepared so the first functional test is a pass rather than the start of a punch list.

  • Startup documentation support
  • Pre-functional checklist preparation
  • Readiness walk-throughs before testing
  • TAB and controls coordination
SVC-06
Cx management

Commissioning management

One point of contact owning commissioning across every trade, from schedule through turnover package.

  • Commissioning schedule inside the construction schedule
  • Startup, TAB and controls sequencing
  • Issues log owned through closure
  • Training coordination and turnover package

What you actually receive

Not a report that says the building is fine. A numbered record of every deficiency found, what it was, who owns it, and whether anyone has verified it closed — plus the test scripts that produced it.

Deficiency log — excerpt

Illustrative. Not client project data.
IDSystemDeficiencySevStatus
0114AHU-3Economizer damper fails to modulate above 42% OA; actuator linkage binding at the blade shaft.2Open
0118VAV-212Reheat valve leaking by. Discharge 11°F above setpoint with zero heating call.2Corrected
0121CHWDifferential pressure reset sequence appears in the approved submittal, not enabled in the controller.3Verified
0126EF-7Runs continuously. Scheduled shutdown never written to the BAS.3Open
0131AHU-1Unit fails to shut down on duct smoke detector alarm. Life-safety.1Open

FPT-04 · AHU-3 economizer

Illustrative
  1. 1
    Force OA temp below changeoverExpected: OA damper drives to minimum position  /  Actual: Minimum 18%
    Pass
  2. 2
    Force OA temp to 58°FExpected: OA damper modulates toward 100%  /  Actual: Stalls at 42%
    Fail
  3. 3
    Simulate mixed-air low limitExpected: Unit trips to heating, alarm posts  /  Actual: Trip at 41°F
    Pass
  4. 4
    Release all overridesExpected: Sequence resumes, no residual alarm  /  Actual: Resumed
    Pass

Issued at turnover

CX-900
  • Commissioning recordReport
  • Systems manual verificationChecklist
  • Completed functional test scriptsScripts
  • Deficiency log, final statusLog
  • Operator training verificationRecord
  • Warranty review scheduleSchedule
323 CommissioningThird partyCXSigned on issue
Copy to

The log is not a private document.

Every deficiency we open goes out in the same form to everyone who has to act on it. Nobody receives a softened copy, and nothing gets closed out in a conversation we were not in.

  • Building owner
  • Construction manager
  • Design team of record
  • Contractor of record

Bring us in before it becomes a warranty problem.

Tell us the building, the phase, and who is asking. If commissioning is not the right scope for what you are describing, we will say so — there is nothing else we are trying to sell you.