Independent third-party commissioning agent

Sheet SVC-200Scope register

Six scopes. One position.

323 Commissioning verifies building systems and does nothing else. We hold no design contract and no installation contract on the projects we commission, which is what lets every phase below end in a document the owner can act on.

For owners

4 scopes

323 is the owner's commissioning authority. Every document below goes to the person who has to live with the building, in the form it was written.

SVC-01
New construction

New construction commissioning

We come in at design and stay through the warranty year. Every phase produces something the owner can hold, and none of it is written by anyone with a stake in the answer.

  1. Design

    Review the design documents against the owner's project requirements and the basis of design, before the drawings are frozen.

    What gets issued

    Design review comments · OPR and BOD gap list

  2. Submittal

    Review equipment and controls submittals for testability and compliance with the written sequences of operation.

    What gets issued

    Submittal review comments

  3. Construction

    Installation verification, prefunctional checklists, and point-to-point spot checks on the controls as they go in.

    What gets issued

    Deficiency log, opened and tracked

  4. Testing

    Functional performance testing of each system against its sequence — including the failure modes nobody wants to force.

    What gets issued

    Completed test scripts · updated deficiency log

  5. Turnover

    Verify that the O&M documentation, systems manual and operator training actually happened and are usable.

    What gets issued

    Commissioning record · systems manual verification

  6. Warranty

    Seasonal and deferred testing, plus the warranty-period review while there is still time to use the warranty.

    What gets issued

    Warranty review report · final log status

SVC-02
Existing buildings

Retro-commissioning and existing buildings

The building is already running. The question is whether it is running the way somebody once specified — and what it has been costing since it stopped.

  1. Investigation

    Inventory the systems, interview the people who operate them, pull what the BAS has been recording, and walk the building.

    What gets issued

    Current facility requirements · system inventory

  2. Diagnosis

    Trend logging and functional testing on equipment that cannot simply be shut down, plus analysis of where the energy is going.

    What gets issued

    Findings log with severity and estimated impact

  3. Recommendation

    Rank what we found by cost, operational disruption, and what it returns — so the list is usable, not just complete.

    What gets issued

    Prioritized improvement list

  4. Implementation

    Support the corrections, then verify each one landed rather than taking a closeout note for it.

    What gets issued

    Verification record

  5. Persistence

    Re-test, and put in place the trends and alarms that catch the drift before it becomes a complaint again.

    What gets issued

    Persistence plan · re-test results

SVC-03
LEED / energy code

LEED and energy code commissioning

The documentation a certification body or a code official will actually accept — produced by a third party, which is frequently the point of the requirement.

  1. Fundamental

    OPR and BOD review, commissioning plan, installation and performance verification, and systems manual review for the energy prerequisite.

    What gets issued

    Commissioning plan · commissioning report

  2. Enhanced

    Design review before mid-construction documents, submittal review, envelope-adjacent coordination, training verification, and the ten-month review.

    What gets issued

    Enhanced commissioning documentation package

  3. Energy code

    Verification and documentation against the commissioning requirements in the adopted energy code.

    What gets issued

    IECC / ASHRAE 90.1 commissioning report

SVC-04
Design reviews

Design phase reviews

A coordination issue found in a design review costs a markup. The same issue found in the field costs a change order, and sometimes a schedule. This is the cheapest point in a project's life to fix anything.

  1. Schematic

    Review the schematic package against the owner's project requirements, while the systems concept is still a decision rather than a drawing.

    What gets issued

    SD review comments · OPR conformance notes

  2. Design development

    Read the developing drawings with a commissioning agent's eye — looking specifically for what will be difficult to start, test, maintain, or operate.

    What gets issued

    DD comment log with priority and responsible party

  3. Construction documents

    Review the CD set, and the commissioning and testing language in the specification itself, before it goes out for pricing.

    What gets issued

    CD review comments · specification review

  4. Back-check

    Verify each comment was addressed rather than acknowledged, and close the log before bid.

    What gets issued

    Closed comment log

For contractors

2 scopes

323 works on the construction side, getting systems ready to pass and keeping commissioning off the critical path. We do not hold a contractor role and the owner's commissioning authority role on the same project — that boundary is what the independence above is made of.

SVC-05
Contractor support

Contractor commissioning support

Commissioning requirements land in the contract whether or not the team is staffed to handle them. We work alongside the mechanical side to prepare systems for testing — so the first test is a pass, not a punch list.

  1. Startup

    Get startup documentation complete and correct the first time, in the form the commissioning authority is going to ask for it.

    What gets issued

    Startup documentation package

  2. Pre-functional

    Prepare the pre-functional checklists and walk the systems before anyone formally tests them.

    What gets issued

    Completed pre-functional checklists

  3. Readiness

    Readiness walk-throughs ahead of formal testing, plus coordination with TAB and controls so neither one is waiting on the other.

    What gets issued

    Readiness findings · coordination notes

  4. Closeout

    Track what the walk-throughs found to resolution, and assemble what closeout actually needs rather than what it will accept.

    What gets issued

    Issue resolution log · closeout documentation

SVC-06
Cx management

Commissioning management

Someone has to own commissioning across every trade — sequencing startups, keeping TAB and controls from blocking each other, and chasing issues to closure. We take that job, and the project team gets one point of contact for all of it.

  1. Schedule

    Build the commissioning schedule into the construction schedule, so testing is not the thing that gets compressed when the date moves.

    What gets issued

    Commissioning schedule · milestone map

  2. Coordination

    Sequence startups across trades, and manage TAB and controls integration as one problem instead of two.

    What gets issued

    Coordination record · meeting minutes

  3. Execution

    Facilitate the commissioning meetings and own the issues log through closure — not through logging.

    What gets issued

    Issues log, tracked to closed

  4. Turnover

    Coordinate owner training, then assemble a documentation package that survives an owner's review rather than one that merely arrives.

    What gets issued

    Turnover package · training record

Four questions worth asking any commissioning provider, including us

Proposals for this scope look nearly identical. These are the four answers that actually separate them.

  • Who else on this project pays you?

    If the answer includes the design team or a trade contractor, the commissioning findings and the fee are connected.

  • Which failure modes will you actually force?

    Anyone can verify a system runs on a mild day. The value is in the smoke-detector shutdown and the low-limit trip.

  • What does the deficiency log look like when you hand it over?

    Ask to see the format. A log without severity, ownership, and verified-closed status is a list, not a record.

  • Who comes back at ten months?

    The warranty review is where commissioning either pays for itself or quietly doesn't happen.